Close
Merle Court Fire Testing
Share your story:

BS8414 Fire testing successfully completed to 2no different buildups on the project Merle Court:​

  1. Structural EPS insulated panels with Vitradual A1 rated aluminium cladding.​

  1. Structural EPS insulated panels with brickwork to the face.  Full cavity fill with blown insulation and retro fitted cavity barriers.​

Full design, supply and installation carried out by Envoy. This was completed alongside project design to ensure that the testing carried out was fully relevant to the building scenario.