BS8414 Fire testing successfully completed to 2no different buildups on the project Merle Court:
- Structural EPS insulated panels with Vitradual A1 rated aluminium cladding.
- Structural EPS insulated panels with brickwork to the face. Full cavity fill with blown insulation and retro fitted cavity barriers.
Full design, supply and installation carried out by Envoy. This was completed alongside project design to ensure that the testing carried out was fully relevant to the building scenario.