Crown Wharf

Appointed by Pellings LLP on behalf of Haus Block Management and Crown Wharf RTM, we acted as the Principal Contractor providing a full turnkey remedial solution to replace combustible cladding materials including ACM, HPL and Timber cladding, along with combustible insulation used as part of the wall build-ups and render system.

Client
Haus Block Management

Project Management
Pellings LLP

Our Service

As part of our overall solution for this project some of the key services we provided were:

  • Intrusive opening up surveys
  • Comprehensive design process including building control and fire engineer signoff
  • Principle contractor role including all welfare, access and installation
  • Thorough and fully transparent QA system covering all aspects of the works
  • Provision of the EWS1 form following completion
  • Liaison with residents including regular communications and updates
  • Landscaping works once site had been demobilised

Materials

  • EWI Render
  • Aluminium Cladding Panels
  • Fibre Cement Cladding Panels
  • Timber effect boarding system
  • Balcony decking
  • Glazed in spandrel panels
  • Brick slips
Station House Inspections

Envoy provided support to the client following the initial opening up works and investigation phases on Station House. 

Full review of 2no opening up inspections, fire consultant’s reports, site visit information, existing O&M manual, original building fire assessment and other information carried out to verify areas requiring remedial works and determine the optimum replacement strategy.​

Early engagement with Envoy fire engineer and building control to verify initial proposals​.

3no additional wall buildups containing a significant presence of combustible insulation identified that were not picked up by the 2 previous fire engineers.

Merle Court Fire Testing

BS8414 Fire testing successfully completed to 2no different buildups on the project Merle Court:​

  1. Structural EPS insulated panels with Vitradual A1 rated aluminium cladding.​

  1. Structural EPS insulated panels with brickwork to the face.  Full cavity fill with blown insulation and retro fitted cavity barriers.​

Full design, supply and installation carried out by Envoy. This was completed alongside project design to ensure that the testing carried out was fully relevant to the building scenario.